Battery Power Tips

  • Home
  • Markets & Applications
    • Automotive
    • Aerospace & Defense
    • Energy Management & Harvesting
    • Industrial
    • IoT
    • Medical
    • Renewables & Grid Connected
    • Robotics
    • Stationary Power
    • Wearables
  • Learn
    • eBooks/Tech Tips
    • EE Training Days
    • FAQs
    • Learning Center
    • Tech Toolboxes
    • Webinars & Digital Events
  • R&D
  • Resources
    • Design Guide Library
    • Digital Issues
    • Engineering Diversity & Inclusion
    • LEAP Awards
    • White Papers
  • Engineering Training Days
  • Advertise
  • Subscribe

World’s largest lithium battery bank grows even larger with 400-MWh addition

By kpickerel | August 19, 2021

The world’s largest lithium-based energy storage facility has just gotten a little bigger. Construction of Phase II of the Moss Landing Energy Storage Facility in California is now complete, adding 100 MW/400 MWh to the site, which now reaches 400 MW/1,600 MWh in total.

LG Energy Solution lithium batteries at the Moss Landing Energy Storage Facility in California. Credit: Vistra

“This facility provides a solution California desperately needs and this expansion was able to come online at the right time – as the summer heat intensifies and demand for electricity is at its highest,” said Curt Morgan, chief executive officer at Vistra. “The state’s laudable immense buildout of intermittent renewable power has both lowered emissions and presented a reliability challenge. California produces an excess amount of renewable power during the day while the sun is up, but often struggles to meet demand as the sun goes down. Our Moss Landing battery system helps to fill that reliability gap, storing the excess daytime power so it doesn’t go to waste and then releasing it to the grid when it’s needed most.”

Announced just 15 months ago with construction starting in September 2020, the Phase II expansion project was completed in July 2021, ahead of schedule despite the many challenges presented by the COVID-19 pandemic. Burns & McDonnell installed the second phase of LG Energy Solution batteries.

The site is the existing Moss Landing Power Plant in Monterey County, a site that’s been providing electricity to Californians since 1950.

“What’s great about this particular site is that it has the space to support even further expansion — up to 1,500 MW/6,000 MWh — while responsibly utilizing our existing site infrastructure, including existing transmission lines and grid interconnection,” Morgan said. “California leads the country in the transition away from fossil fuels and the Moss Landing Energy Storage Facility stands as a model for how batteries can support intermittent renewables to help create a reliable grid of the future.”

The 100-MW/400-MWh Phase II expansion is operating under a 10-year resource adequacy agreement with PG&E. The 300-MW/1,200-MWh Phase I project has a similar 20-year resource adequacy agreement with PG&E.

News item from Vistra

You may also like:

  • battery safety standards
    Battery safety standards and testing
  • solid-state EV batteries
    Solid-state EV batteries – are we there yet?

  • 18650, 21700, 30700, 4680 and other Li-ions – what’s the…

  • Lithium battery recycler to go public

  • The difference between lithium ion and lithium polymer batteries

Filed Under: Battery types, lithium-ion

 

Next Article

← Previous Article
Next Article →

“battery
EXPAND YOUR KNOWLEDGE AND STAY CONNECTED
Get the latest info on technologies, tools and strategies for EE professionals.

Featured Contributions

  • Preparing for sodium-ion battery storage? Advanced simulation models can help
  • Q & A: why automation is essential for advancing EV battery manufacturing
  • Battery and charging innovations driving electrification
  • What is a lithium battery digital passport?
  • Battery testing: critical to the rise of electric vehicles
More Featured Contributions

EE TECH TOOLBOX

“ee
Tech Toolbox: Test & Measurement
We’ve gathered articles that include hands-on product tryouts and reviews. Indeed, every article in this issue uses an oscilloscope in one way or another so you might just call this “The Oscilloscope Tech Toolbox.”

EE LEARNING CENTER

EE Learning Center

ENGINEERING TRAINING DAYS

engineering

RSS Current EDABoard.com discussions

“bills
Battery Power Tips
  • EE World Online
  • Design World
  • Medical Design & Outsourcing
  • Solar Power World
  • The Robot Report
  • Contact
  • Sign Up Enews

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising | About Us

Search Battery Power Tips

  • Home
  • Markets & Applications
    • Automotive
    • Aerospace & Defense
    • Energy Management & Harvesting
    • Industrial
    • IoT
    • Medical
    • Renewables & Grid Connected
    • Robotics
    • Stationary Power
    • Wearables
  • Learn
    • eBooks/Tech Tips
    • EE Training Days
    • FAQs
    • Learning Center
    • Tech Toolboxes
    • Webinars & Digital Events
  • R&D
  • Resources
    • Design Guide Library
    • Digital Issues
    • Engineering Diversity & Inclusion
    • LEAP Awards
    • White Papers
  • Engineering Training Days
  • Advertise
  • Subscribe