Battery Power Tips

  • Home
  • Markets & Applications
    • Automotive
    • Aerospace & Defense
    • Energy Management & Harvesting
    • Industrial
    • IoT
    • Medical
    • Renewables & Grid Connected
    • Robotics
    • Stationary Power
    • Wearables
  • Learn
    • eBooks/Tech Tips
    • EE Training Days
    • FAQs
    • Learning Center
    • Tech Toolboxes
    • Webinars & Digital Events
  • R&D
  • Resources
    • Design Guide Library
    • Digital Issues
    • Engineering Diversity & Inclusion
    • LEAP Awards
    • White Papers
  • Engineering Training Days
  • Advertise
  • Subscribe

CleanSpark completes solar microgrid with 400-kWh iron-flow battery at Camp Pendleton

By kpickerel | May 3, 2019

Microgrid company CleanSpark announced it has achieved government acceptance of its solar-plus-storage microgrid located at the Marine Corps Base Camp Pendleton in California.

Camp Pendleton is the major West Coast base of the United States Marine Corps and is one of the largest Marine Corps bases in the United States. Completed by general contractor Bethel-Webcor JV, the Communications Information Systems (C.I.S.) Operations Complex includes a data center, headquarters facility, maintenance and supply warehouse, and related communications infrastructure. The complete project receives backup power from UPS and traditional standby generators provided by other contractors. A subset of the critical loads are served by CleanSpark’s advanced solar-plus-storage microgrid using a 400-kWh iron-flow battery from ESS DC-coupled with 150-kW solar PV generation located on both carport shade structures and the buildings’ roofs. CleanSpark was responsible for the optimization, design, engineering, and deployment of the microgrid.

“There have been quite a few technology achievements on this project, but what excites me the most is the functional outcome,” said Anthony Vastola, SVP of projects for CleanSpark. “This is a hybrid zero-net-energy facility incorporating both off-grid and grid connected renewable generation that work together to support project economics while also providing energy security. With strong system modelling, innovative engineering expertise, and effective microgrid control, we believe economics and energy security should go together.”

The first project to receive CleanSpark’s latest mPulse DER Energy Manager, operational intelligence is co-located with the microgrid offering resilient communications disconnected operation and increased cyber-security leveraging its hybrid-cloud configuration. The on-site generation solution includes separating the building loads so that the priority loads are on the islanded system and non-priority loads are served from the utility with each renewable asset interacting with the grid based on mode of operation.

“We are pleased to commission our second Energy Warehouse system in a military microgrid application,” said Craig Evans, Founder and CEO of ESS Inc. “Camp Pendleton is the Marine Corps’ largest West Coast expeditionary training facility for Marine, Army and Navy units. The Camp will especially benefit from our battery’s solar-plus-storage capabilities, which enable the microgrid to store excess solar energy for later use during times of peak electricity demand.”

News item from CleanSpark


Filed Under: Aerospace & Defense

 

Next Article

← Previous Article
Next Article →

“battery
EXPAND YOUR KNOWLEDGE AND STAY CONNECTED
Get the latest info on technologies, tools and strategies for EE professionals.

Featured Contributions

  • Preparing for sodium-ion battery storage? Advanced simulation models can help
  • Q & A: why automation is essential for advancing EV battery manufacturing
  • Battery and charging innovations driving electrification
  • What is a lithium battery digital passport?
  • Battery testing: critical to the rise of electric vehicles
More Featured Contributions

EE TECH TOOLBOX

“ee
Tech Toolbox: Internet of Things
Explore practical strategies for minimizing attack surfaces, managing memory efficiently, and securing firmware. Download now to ensure your IoT implementations remain secure, efficient, and future-ready.

EE LEARNING CENTER

EE Learning Center

ENGINEERING TRAINING DAYS

engineering

RSS Current EDABoard.com discussions

  • 12VAC to 12VDC 5A on 250ft 12AWG
  • Lightbox circuit help
  • Engineer's own PCB layout software guide?
  • LVS Mismatch Error in Simple Layout
  • Does mobility carrier ratio changes with Wn? (0.18um) inverter design
“bills
Battery Power Tips
  • EE World Online
  • Design World
  • Medical Design & Outsourcing
  • Solar Power World
  • The Robot Report
  • Contact
  • Sign Up Enews

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising | About Us

Search Battery Power Tips

  • Home
  • Markets & Applications
    • Automotive
    • Aerospace & Defense
    • Energy Management & Harvesting
    • Industrial
    • IoT
    • Medical
    • Renewables & Grid Connected
    • Robotics
    • Stationary Power
    • Wearables
  • Learn
    • eBooks/Tech Tips
    • EE Training Days
    • FAQs
    • Learning Center
    • Tech Toolboxes
    • Webinars & Digital Events
  • R&D
  • Resources
    • Design Guide Library
    • Digital Issues
    • Engineering Diversity & Inclusion
    • LEAP Awards
    • White Papers
  • Engineering Training Days
  • Advertise
  • Subscribe